Flag Building Conference Center
Location: Clearwater, FL
Project Duration: 2 years
Project Cost: $60,000,000
Facility Size: 450,000 square feet
The canvas was a 450,000-square-foot-seven-story empty shell that enveloped an entire city block in downtown Clearwater. The task was to complete the interior build out of a one-of-a-kind conference center and training facility that would draw worldwide attention. Nova was selected from an elite list of prominent bidding general contractors due to reputation for attention to detail and for our blue collar approach towards project management. Nova commenced this project by reaching out to our international manufacturing partners to source a millwork, stone, and glass package that would accentuate its grandeur. We installed new MEP systems, as well as a commercial kitchen with the capacity to feed a staff of 2,000, three meals a day. Nova supplied and installed all of the custom loose furniture, and the entire facility was completed with a five-star finish, containing exotic stones and materials. The highlights of the project include a breathtaking three-story stone atrium, five high tech film rooms, a full-service health spa, and a training facility, incorporating equipment designed using 21st century technology.
Ritz Carlton Laguna Niguel
Location: Dana Point, CA
Project Duration: 6 months
Project Cost: $18,000,000
Guest Rooms: 393
Hotel Class: 5 Star
Recognized as a gem in the Ritz Carlton crown, Nova HRC was chosen to complete the renovation of the luxury brand's signature four-star ocean-side Laguna Niguel Resort. The scope of work included a complete demolition and refurbishment of the existing guestrooms, restaurants, and public spaces for the 393-room Mediterranean-style retreat. Nova installed new MEP systems, lighting and sourced all of the stone, marble, and millwork packages. Highlights of the project included construction of a silver-leafed rotunda and installation of marble flooring the lobby area.
San Diego Marriott La Jolla
Location: La Jolla, CA
Project Duration: 4 months
Project Cost: $3,500,000
Hotel Class: 4 Star
Guest Rooms: 349
Renovating the 350-room Marriott La Jolla proved to be as pleasant as its sunny, temperate southern California climate. Since it had been seven years since their previous renovation, and to maintain the properties image, our goal was to provide them with the highest quality accoutrements and finishes. The guestrooms were enhanced by installing new ceramic entry ways, carpet, drapes, and furniture. The work in the bathrooms was extensive, including framing work, new tile, millwork, vanities, plumbing, and fixtures. All of the hotel corridors received new vinyl wall coverings and carpet with decorative lighting sconces and millwork accent pieces. All of the rooms were furnished with new entry doors, hardware, and key lock systems. The Marriott La Jolla was renovated during their peak season, and the project was completed with an aggressive 90 day schedule.
Tampa COS Conference Center
Location: Tampa, FL
Project Duration: 3 months
Project Cost: $7,000,000
Facility Size: 88,000 square feet
The conversion of a nineteenth century, national landmark Tampa cigar factory, to a state- of-the- art training and conference center, provided an exciting challenge for the Nova staff. The utmost attention was focused on the preservation of the building's original attributes, including its brick façade, embossed tin paneled ceilings, rod iron accents, and lead windows. A new mechanical, electrical, and plumbing system was installed along with modern flooring, walls, and high-end finishes throughout the facility. The new 90,000-square-foot conference center features an extensive millwork package, a modern film room, and full service health spa.
Nashville COS Conference Center
Location: Nashville, TN
Project Duration: 4 months
Project Cost: $8,000,000
Facility Size: 40,000 square feet
Award: Received 35th Annual Metropolitan Historic Commission Preservation Award
When Nova completed the renovation and conversion of the first multi-room school house, built in Nashville in 1898, the result was not only a world class conference facility, but it received accolades for receiving the 35th Annual Metropolitan Historic Commission Preservation Award. The project details included a complete demolition and new framing of the existing 40,000–square- foot interior footprint, as well as the installation of a new roof and MEP systems. Nova's tradesman meticulously restored the original wood floors, paneling, doors, and millwork and finished the space with fresh paint and new hardware. The 35th Annual Metropolitan Historic Commission Preservation award was bestowed upon Nova for our work in the preservation of Davidson County's architectural heritage. The Nashville COS Conference Center features a modern film room and full-service health spa.
Dallas COS Conference Center
Location: Dallas, TX
Project Duration: 4 months
Project Cost: $6,200,000
Facility Size: 60,000 square feet
When Nova was awarded the project and assumed the task of transforming a 60,000-square-foot structure into a world class conference and training facility, our design team shifted into high gear. The extensive structural work for the project included the demolition and reconstruction of the entire roof and 20,000-square-feet of foundation. During the roofing process, the Nova team added structural steel to support two new 70-ton rooftop air conditioning units. Other project details included a new plumbing system, fire sprinkler, and alarm system. To enhance the character of the building, design elements such as the addition of new skylights and the construction of an external steel staircase were added. Finally, we modified the configuration of the interior by adding new walls and ceiling systems and by finishing the space with new carpet and a four-star paint job. The Dallas COS Conference Center features three modern film rooms and a full-service health spa.
PARTIAL PORTFOLIO LIST
Mist Spa, Scottsdale, AZ
| Doubletree, Sonoma, CA
| Four Seasons Hotel, Beverly Hills, CA
| Hilton Head Marriott, Hilton Head Island, SC
| Hilton Hotel, Torrance, CA
| Hilton Waikoloa, Waikoloa, HI
| Holiday Inn Lido Beach, Sarasota, FL
| Hotel Bel Aire, Bel Aire, CA
| Hyatt Regency, New Orleans, LA
| Hyatt Hotel, Scottsdale, AZ
| Hyatt Hotel, Waikiki, HI
| Hyatt Lake Tahoe, Incline Village, NE
| Loews Hotel, Santa Monica, CA
| Marriott Hotel, Manhattan Beach, CA
| Napa Valley Marriott, Napa Valley, CA
| Ojai Valley, Ojai, CA
| The Q Center, Chicago, IL
| Radisson Resort, Scottsdale, AZ
| Regal Hotel, Chicago, IL
| Regal Hotel, Minneapolis, MN
| Renaissance, Scottsdale, AZ
| Westin Hotel, Detroit, MI
| Ocean Hotel, Key West, FL